Operating a Quarry
                        
                          Published on February 19, 2015
                        
                        
                            Project Details
Client Name: RMC Ready Mix India Ltd
Location: Sonnappanahalli village, Bangalore, Karnataka
Objective/Challenge
- To operate a quarry next to village.
- To feed a 300 Tons Per Hour crusher from Quarry not even producing a days requirement.
Approach
- When Uttam took up the quarrying contract for RMC, the first thing that was done was to develop the proper benches in the Mine and use controlled blasting.
- Each blast was monitored for vibrations and noise produced to ensure that vibrations and noise generated in the blasting is within the prescribed limits.
- To feed a 300 Tons Per Hour crusher from Quarry not even producing a days requirement.
End Result
- 
- Machinery Deployed
- Here is the result in fortnight wise production (on single shift basis)
 
| Fortnight | Output In Ton | 
| 1 | 1471.98 | 
| 2 | 3711.93 | 
| 3 | 6431.49 | 
| 4 | 2864.90 | 
| 5 | 8252.03 | 
| 6 | 6145.05 | 
| 7 | 5074.44 | 
| 8 | 3742.77 | 
| 9 | 8236.24 | 
| 10 | 7601.81 | 
| 11 | 7121.00 | 
| 12 | 4334.28 | 
| 13 | 2022.93 | 
| Total | 67010.85 |