Operating a Quarry

Project Details

Client Name: RMC Ready Mix India Ltd
Location: Sonnappanahalli village, Bangalore, Karnataka

Objective/Challenge

  • To operate a quarry next to village.
  • To feed a 300 Tons Per Hour crusher from Quarry not even producing a days requirement.

Approach

  • When Uttam took up the quarrying contract for RMC, the first thing that was done was to develop the proper benches in the Mine and use controlled blasting.
  • Each blast was monitored for vibrations and noise produced to ensure that vibrations and noise generated in the blasting is within the prescribed limits.
  • To feed a 300 Tons Per Hour crusher from Quarry not even producing a days requirement.

End Result

    • Machinery Deployed
    • Here is the result in fortnight wise production (on single shift basis)
FortnightOutput In Ton
11471.98
23711.93
36431.49
42864.90
58252.03
66145.05
75074.44
83742.77
98236.24
107601.81
117121.00
124334.28
132022.93
Total67010.85