Blasting Consultation in Mining, Quarrying & Construction

Bringing Expertise & Precision to Exploration, Estimation & Excavation

Blasting is the primary operation in mining, quarrying and civil construction works such as site levelling, foundation and trench excavations, etc. It is the cheapest, fastest and safest way of rock breaking, if executed properly and is the preferred option for any kind of comminution.

Blasting utilises different types of explosives depending on the types of rock compositions and properties. Blasting involves numerous hazards during the explosive manufacturing, distribution, storage and transportation and use, so proper risk management is necessary.

Uttam Blastech is an industry leader for all the services related to blasting.

Services at Uttam Blastech:

  • Blasting Consultation:

Blasting involves the use of explosives, therefore, proper guidance and supervision and legal compliances throughout the entire process of blasting is a must. Uttam Blastech provides end-to-end consultation, right from the blasting methodology, types of explosives to be used, permissions and licenses needed up to the supervision techniques.

Our solutions are designed to overcome constraints and barriers that may be posed by the social, economic and legal conditions prevailing at the site to achieve the desired output.

  • Pre-Blast Survey:

Blasting generates energy which is used in cutting the rock, but residual energy is transmitted to the neighbourhood. This residual energy if it reaches a certain magnitude, is harmful to the surrounding structures. Therefore, a pre-blast survey is needed to determine the existing conditions of the surrounding structures so that, blasts can be designed to ensure that there is no damage to these structures.

  • Vibration Measurement and control solutions

Safety of the working personnel and the neighbourhood structures during blasting is of the utmost importance. Uttam Blastech provides services of Vibration Analysis, Vibration Measurement, Counselling, Prediction and Remote Vibration Measurement. We are a one-stop solution for vibration and Noise measurement.

We also provide a preventive solution for damages caused by vibrations resulting from blasting viz., propagation equation. A site-specific equation is generated by Uttam Blastech to arrive at an exact relationship between the quantity of explosives used and the impacting vibrations produced. This helps our client to ensure that during any blasting or pile driving they do, they do not harm surrounding structures by making sure that the resulting vibrations are under prescribed limits.

  • Legal compliance advisory:

It is essential that the blasting carried out at a site is compliant with industry and environmental standards to avoid the legal issues. Our legal team at Uttam Blastech provides assistance on statutory compliances, risk analysis, periodic surveys and third-party testimonials.

Why Uttam Blastech?

Uttam Blastech has a rich and varied experience when it comes to blasting. We have industry experts who provide customised solutions for you blasting problems.

  • Quick Response
  • No Bureaucratic Hurdle
  • Help in legal cases due to ground vibrations & noise like providing testimonial in courts
  • Provision for daily, weekly, ground vibrations & noise monthly monitoring option based on client requirement.
  • Tailor made solutions based on client’s requirement.

 

Case Study 1:

Client Name: DLF Laing O Rourke (India) Ltd

Location: Basheerbagh, Hyderabad, India

Objective/Challenge:

  • To blast around 300,000 Cubic Meters of Rock at a location 450 Meters from the Office of the Commissioner of police Hyderabad.
  • 1 Kms from the Secretariat
  • In a VIP locality and with heritage structures.
  • A perfect concoction for blast related litigation.
  • DLF approached Uttam, Uttam suggested
  • DLF blasted and excavated 250,000 cubic Metres from the site.

Approach:

  • Create documentation that can stand scrutiny in a legal tangle.
  • 3rd Party monitoring of all the blasts to act as an evidence in case of litigation and to ensure that the contractor adheres to prescribed vibration limits.

Client Testimonial:

Click here to view the testimonial by the client.

 

Case Study 2:

Client Name: Sri Sai Lakshmi Construction Company

Location: Madhya Pradesh, India

Objective/Challenge:

  • To blast 125000 Cubic Meters next to 75 year old Kekote Dam that supplies water to the City of Gwalior in the state of Madhya Pradesh in India
  • Uttam blasted 125000 Cubic Meters of Rock in 6 Months to the satisfaction of the dam authorities.

Approach:

  • Safety First.
  • Safety and Production together.
  • Understand what to do and implement.

End Result:

A work executed well in time.

Client Testimonial:

Click here to view the testimonial by the client.

 

Case Study 3:

Client Name: Pioneer Builders

Location: Telangana State, India

Objective/Challenge:

  • Blasting below a 440 KV Powerline connecting the capital city of the state of Telangana, Hyderabad with Nagarjuna Sagar Power house which is an important source of electricity supplies to the city of Hyderabad. Almost the entire canal of SLBC (Srisailam Left Bank Canal) was ready but for the a length of around 800 Meters
  • M/s. Pioneer Builders were awarded the work.
  • M/s Pioneer Builders approached Uttam for Rock blasting.

Approach:

  • To meet the production targets without compromising on the safety, Uttam decided to use in hole delays and blast different decks at different intervals to keep the charge per delay within the limits.
  • As many as 3 delays were used in a single hole.
  • Each blast was monitored for vibrations and the noise for the comfort of the client, Irrigation department and the Tower Line owner.
  • Uttam was the first to use in hole delays and seismograph in the construction sector in the state.

End Result:

A work well accomplished.

 

Case Study 4:

Client Name: Sri Laxmi Engineering Company

Location: Karimnagar,Telangana,India

Objective/Challenge:

  • Rock Blasting next to a Power producing Turbine.
  • When NTPC (Super Thermal Power Station) decided to expand their Super Thermal Unit at Ramagundam Super Thermal Power Station, the challenge was to excavate around 37,000 Cubic Meters of Rock in a very critical area 20 meters away from their Power Producing Turbine and around 6 Meters away from the Pump house that supplies water to the entire Unit.

Approach:

  • To do a professional job in time, with all the permissions and document all the events related to the blast and such as vibrations and noise in blasting. Work completed in 37 days, producing 1000 Cubic Meters a day. A thorough and acclaimed work done.
  • The work was awarded to M/s. Sri Laxmi Engineering Company.
  • Sri Laxmi Engineering Company approached Uttam for Rock Blasting.
  • The first challenge was to convince about the efficacy and the safety of the proposed Methodology. A seminar was arranged for all the cornered to address their concerns. It was agreed that initial blast would be conducted at the farthest place as a trial.
  • Another challenge was to obtain all the permissions required to use the explosives as the area was terrorist infested at that time. It took considerable time to convince the authorities about the measures taken to ensure the safe keeping of explosives.
  • Once everything was in place, the work was executed in just 37 days i.e. blasting and excavating 1000 Cubic Meters per day; well within the time in spite of all the hurdles and concerns.

Client Testimonial:

Click here to view the testimonial by the client.